Thursday, September 4, 2008

Base Plate @ ASE Penang

A happy client is one who calls you back to do the next job for him!!! in this case VSL has made ASE happy. After our load test, we have been called to install base plates for their new machines.
I have managed to solve their problem at site by proposing to use drop-in anchors instead of coring and installing hold bown bolts as well as not to epoxy glue the plate to the floor to facilitate future shifting. A plywood template was also designed by me in order that ASE can use that as a guide to drill holes for the deop-in anchors.

Another week in Penang (2-5 Sep 08)

No comments: